NEWS

Spellman picks Verotec racks for submarine cable repeater equipment

SOUTHAMPTON, UK – Some 98% of all intercontinental telephone calls, internet traffic, emails, messaging and private data traffic are carried as digital data by fibre optic cables laid by specialist ships across the world’s oceans. Today’s cables, typically 25mm in diameter and weighing some 1.5 tonnes/km, are a far cry from the first working cables, laid in 1853 and linking Great Britain with Ireland, Belgium and the Netherlands.

Spellman manufactures ship-borne power feed equipment (PFE), used to power submarine fibre optic cable repeaters. A typical PFE system provides for 20kW capability with constant power performance between 8 and 10kV. Spellman systems are installed on many of the major cable laying ships around the world; they are the preferred choice of cable shipbuilders and owners for ship-borne power feed equipment.

Spellman has selected Verotec's IMRAK 19” racks as the enclosure of choice for its PFE because of its versatility and configurability, the range of standard sizes available and its strength and rigidity. Verotec supplies a mix of 12, 17, 22 and 37U high, 600 wide and 800 deep racks to house the various elements of the PFE system. The cabinets are fitted with lifting eyes to assist installation on board ship; bolting down brackets are also fitted to secure the units to the ship. Cable gland plates are provided in the base of each rack and custom fixing brackets enable two smaller units to be assembled one on top of the other to create a segregated but contiguous assembly.

www.verotec.co.uk

Other tags: 
Company: 
Twitter icon
Facebook icon
Google icon
StumbleUpon icon
Digg icon
LinkedIn icon
Reddit icon
e-mail icon
Feature

As data demand ramps ever higher, researchers are looking to innovative amplifier designs to help transport a broader light spectrum through optical fibres, finds Andy Extance

Feature

Duncan Ellis shares his views about the increased focus on automation from network operators, and how the physical layer has so far stubbornly resisted the move

Feature

Switching off copper networks where fibre has been deployed is the end game, so why are so few operators doing it, wonders Pauline Rigby

Feature

With demand for fibre to the premises increasing, Keely Portway looks at the role training plays in ensuring installation skills remain available to meet this growing demand

Analysis and opinion